From prototype to production. Custom parts, made to your drawing.Explore our factory
Get a quote

WEKO FIELDNOTES / QUOTATION PREPARATION

A better brief.
A clearer quote.

Your part. Your requirements.
The details that move manufacturing forward.

English PDF · 1 page · 4 KB · No account required

Real machined housings, threaded sleeves, a mounting component and a threaded pin on a white surface
REAL COMPONENT REFERENCES

Different geometry.
One well-defined requirement.

01—09

01 / START SIMPLE

Four things to start
the conversation.

You do not need a perfect document pack to get in touch. Tell us what is known and what still needs review.

01

The part

A drawing, CAD model, sample reference or clear description.

02

The material

Exact grade and condition, or ask us to review the options.

03

The quantity

First order, repeat demand and any price-break quantities.

04

The destination

Delivery country and the date you are working toward.

02 / PICK YOUR STARTING POINT

Start where
your project is.

A released drawing, a physical sample or an early requirement each needs a different first conversation.

01

I have CAD & drawings

START WITH THE RELEASED FILES

Send the model and drawing together when available. Identify which document governs the requirements.

  • 3D: STEP / STP or IGES / IGS, with the matching 2D drawing.
  • 2D: PDF, DWG or DXF with units, revision and readable dimensions.
  • Mark critical features, tolerances, threads and required surface conditions.

A CAD model shows geometry. The released drawing should define the requirements that the model does not carry.

02

I have a sample or reference

START WITH WHAT YOU HAVE

Share clear photos, the part’s purpose, approximate dimensions, material information and the quantity you need.

  • Show the whole part and important mating, sealing or mounting features.
  • Tell us whether the request is for a similar component or a drawing-defined replacement.
  • Discuss physical sample shipment and drawing preparation before sending a sample.

A photograph alone does not define material, tolerance or fit. We will identify the information needed for a manufacturing review.

03

I’m still defining the part

START WITH THE REQUIREMENT

Describe what the component does, where it fits and what you already know. A simple sketch can help the discussion.

  • Share the application, operating environment and important interfaces.
  • Indicate possible material, first quantity and prototype or production stage.
  • List open questions so the discussion can focus on the manufacturing route.

Start the conversation before uploading confidential details. Manufacturing feasibility, scope and quotation follow the agreed specification.

03 / MAKE THE REQUIREMENTS CLEAR

The part is more
than its shape.

Connect the drawing to material, fit, finish and inspection. Clear requirements help us review the manufacturing route and quotation scope.

PART NUMBER / REVISION
Geometry → Material
→ Finish → Acceptance
A useful RFQ connects all four.
01

Drawing & revision

ONE CLEAR SOURCE OF REQUIREMENTS

Include the part number, current revision, units and the documents that belong together. Identify reference-only files and superseded versions.

  • Matching 2D and 3D revisions
  • Units and datum references
  • Controlled dimensions and general tolerances
Review the drawing checklist
02

Material & condition

THE GRADE IS ONLY THE START

Specify the governing standard, grade and condition or temper. State whether material documentation is required. If the choice is open, describe the operating conditions.

  • Grade plus temper / condition
  • Material evidence required
  • Substitution only by agreement
Explore material guides
03

Fit, threads & tolerances

DEFINE THE INTERFACE

Identify the dimensions that control function. Include thread standard, size, pitch, depth and acceptance. Specify bores, counterbores, fits and datums clearly.

  • Critical features tied to datums
  • Complete thread and hole callouts
  • Surface finish where function depends on it
Plan critical tolerances
04

Finish & inspection

AGREE THE FINISHED CONDITION

Define the finish, color or reference sample, coating thickness and masking needs where applicable. Agree what is measured after finishing and which reports you need.

  • Finish and masking requirements
  • Final-state dimensions and checks
  • Inspection record / report requirements
Plan quality & inspection

04 / PLAN THE COMMERCIAL DETAILS

The right quantity.
The right expectations.

Include the first order quantity, repeat demand, delivery destination and target date. If you need quantity-break pricing, list the quantities you want compared.

Plan prototype-to-production handover
FIRST ORDERQuantity + part revisions
REPEAT DEMANDForecast + batch sizes
DELIVERYDestination + target date
ACCEPTANCEInspection + documents

Pricing and lead time follow the agreed part, process and order scope.

CONFIDENTIAL BY ARRANGEMENT

NDA before drawings?
Start with a conversation.

Share a non-confidential project outline and ask us to arrange an NDA before sending protected files. The Contact page includes a dedicated NDA-first option.

Request NDA first

QUICK ANSWERS

Before you send.

Explore the buyer guide library
Do I need every detail before contacting WEKO?

No. Send the part description and the information you have. Mark unknowns clearly. A manufacturing quotation needs an agreed scope, but you can begin the discussion before every requirement is finalized.

Can I request small quantities or prototype parts?

Yes. Share your first quantity and any likely repeat demand. WEKO supports prototypes, small batches and production; the manufacturing route, pricing and lead time are confirmed for your component.

Can I ask for an NDA before sharing drawings?

Yes. Use the NDA-first option on the Contact page, or ask by email before providing confidential files. Do not attach protected drawings until the confidentiality arrangements are agreed.

Which attachment formats are supported?

The Contact form accepts CAD, PDF, common images and archives, up to100 MiB per attachment. STEP/STP, IGES/IGS, DWG/DXF and PDF are useful starting formats. Use an archive for multiple related files, and include a revision list.

Is the PDF checklist an inspection report or certification?

No. The downloadable drawing checklist is a preparation guide. Material certificates, inspection reports and project-specific test records are separate documents agreed for your order.

TURN A REQUIREMENT INTO A MANUFACTURING DISCUSSION

Ready to talk about your part?

Send the drawing or start with what you know.

Send your project
Start with the drawing

Discuss your custom CNC metal part with WEKO.

Send drawings to engineering